COOLING TOWER CENTRAL PROCEDURE
A. Corrosion Inhibitor
1. add two total tower inhibitor in the estimated starting dosages
2. check weekly - pH, conductivity, Molybdenum
3. adjust dosage based on weekly checks
4. send sample to lab monthly
5. adjust dosage based on lab results
6. visually inspect tower quarterly
B. Biological Control
1. add biocide A or B based on estimated starting dosage
2. check weekly - visual test and odor
3. Alternate biocide A and B to prevent resistant strains from
developing
4. send sample to lab monthly
5. adjust dosage based on lab results
6. visually inspect tower quarterly
TYPICAL COOLING TOWER CONTROL RANGES
Item |
Control Range |
Appearance |
|
Conductivity |
800-1200 |
pH |
7.5-9.0 |
T Hard |
800 max |
Cl |
|
p Alk |
100 max |
T Alk |
100-400 |
T.I. Phos |
4-8 |
Moly |
4-8 |